Currently we operate a no charge for plans policy – meaning you do not pay for our time, skills, knowledge and experience when we develop a custom plan for your project. We do this in goodwill that the project will go ahead with our team, for the manufacture and installation.
To enable us to continue to offer this no charge service we do stipulate that there is a limit of two rounds of changes only. Any changes after this, will be invoiced at the designer’s hourly rate, regardless of project going ahead or not.
Plan release – generally plans are not released until the deposit invoice is paid and plans finalised. However, if you would like to release the plans before this, we do offer the option to pay a release fee of $___________ and a signed guarantee the project build and installation will be going ahead with Phillip Joblin Kitchen and Furniture. The cost of the release fee will be deducted from the final invoice of the project.
Plan Purchase – as our plans are custom and unique to each client/project and we pride ourselves on our skills, knowledge and experience, our preference is that our plans are brought to life by our team. Therefore, we don’t offer plans for outright sale. If this is something that you are interested in, we are open to a discussion and consideration of this.
Upon acceptance of your quote a deposit invoice will be issued. The deposit invoice will be made up of the following:
50% of materials (for example: but not limited to cabinetry, splashbacks, benchtops, handles, sinks, tapware etc.) and labour and 100% of any appliances (for example, but not limited to: oven, dishwasher, rangehood, fridge etc.)
Payment of your deposit allow us to prepare final drawings and documentations required for the manufacture of your kitchen and sub-trade requirements. Also, to order in materials and appliances required for the project start. No work will begin, materials or appliances ordered, sub-trades booked, before your deposit is paid. The timeline for your project will begin from deposit invoice paid date and secures your place in the manufacturing/workshop que.
Approx. 14 business days prior to the confirmed installation date, you will be issued with a progress payment invoice for 40% of the remaining materials and labour portion of the original quote. Installation will not proceed until invoice is paid in full. If payment is delayed after the invoice due date, the installation date may be rescheduled to a later date at our discretion.
A final invoice will be issued once project is completed and all supplier invoices have been received. This will be made up of but not limited to the following:
10% remaining materials and labour portion of the original quote, and any work, materials or appliances outside of the original quote scope, removal, installation, travel, any freight charges by suppliers and on-charge of other trades needed to complete the job (please note other trades may be charged separately, depending on their invoice availability at the time of our invoicing)
Any credit of plan release payments, adjustments for items that were in original quote that were not ordered or made (where changes were made from original quote by client after deposit paid, items may still be charged for regardless of not being used in finished project), any discretionary discounts etc.
After payment of the final invoice, where applicable appliance warranties and the like will be emailed to you.
All invoices are due 7 days after invoice date. Payment to be made by online banking with your Name or Invoice Number as reference.
Account details are: Phillip Joblin Kitchen & Furniture Ltd, TSB 15 3950 0704312 10
1.1 Any materials will not be accepted for return without our prior written consent (which may be withheld at our sole discretion), on the condition that:
(a) you have notified us and obtained our agreement within seven (7)days of receiving the materials; and (b) the materials are returned in the condition in which they were received (including all packaging).
1.2 Subject to the conditions of the warranty set out in clause 1.3, we warrant that if any fault in any of our workmanship becomes apparent and is reported to us within twelve (12)months from the date of delivery (time being of the essence) then we will remedy the workmanship.
1.3 The conditions applicable to the warranty given under clause 1.2 shall not cover any defect or damage which is caused by or arises through:
(a) the failure on your part to properly maintain any materials or to follow any instructions or guidelines provided by us; or
(b) the continued use of any materials after any defect or damage becomes apparent.
1.4 We shall not be liable to compensate you for any delay in remedying our workmanship and the warranty shall cease if any of the services are installed, altered or repaired without our consent by any third party.
1.5 For materials not manufactured by us, the warranty shall be the current warranty provided by the materials manufacturer. We shall not be bound by any condition, representation or warranty other than that which the materials manufacturer gives.